Project Description:

Supply, Installation & Comissioning of 11kV OHL Earth Fault Indicators Implementation of Line Fault Passage Indicator goes along with the aim of continually improvement of AADC system and AADC management commitment to provide the best services to our valued consumers.

The use of these indicators will affect directly and positively on our OHL network and increase the efficiency of our system. Mainly this instrument will have a direct impact in: Reducing Fault Outage Times Reducing Manpower Costs and Efforts Reducing Plant Duty Fewer Customer Complaints Reduction in Consumer Hours Lost Reduction in expected Danger to nearby people

Project Details

The scope of work covers the general requirements for the supply and installation of Line Fault Passage Indicators, where required on specified locations by AADC Eng. This scope covers supply, installation and commissioning of full instrument as well as the retrofitting of GSM communication system to the existing earth fault indicators in our network (in case the complete new equipment would have been installed in a location where an EFI Exists, only the communication modem at that location would be installed and the EFI will be installed in another location). Also it covers the supply of spare parts needed for any future maintenance if required. Supplier should provide all necessary documents related to the supplied instrument and a detailed comparison between manufacturers with necessary points to AADC, O&M to approve the best quality material for the best performance.

This contract will cover City Area and Rural Regions.