ADP Contract No. 2101-211 (Completed)

Permanent Power to the Abu Dhabi Terminals (ADT) Tents at Khalifa Port Abu Dhabi Terminals (ADT)

ALSTOM TRANSPORT SA – ALTES Reference: CONT6561 – EXTENSION STATION

Transportation & Erection of Electrical Equipments related to the New Route 2020 Metro Project Substations for 9 EXTENTION MS Metro Project Substations for 9 EXTENTION MS

ALSTOM TRANSPORT SA – ALTES Reference: CONT6561 ENHANCEMENT WORKS (COMPLETED)

Transportation & Erection of Electrical Equipment’s related to the New Route 2020 Metro ENHANCEMENT Works for 7 Nos of Existing Metro Stations Transportation & Erection of Electrical Equipment’s

ALSTOM TRANSPORT SA – ALTES Reference: CONT6561 DEPOT WORKS (COMPLETED)

Transportation & Erection of Electrical Equipment’s related to the New Route 2020 Metro ENHANCEMENT Works for 3 DEPOTS New Route 2020 Metro

AL MIRFA CONTRACT NO. M-23700 (Completed)

GT09 – Main Transformer Re-winding, Re-Insulating & Commissioning GT09 – Main Transformer

TRANSCO Tender No. N-14842 (Completed)

BNPP & TRANSCO

CHINA HARBOUR ENGINEERING CO. L.L.C Cable Works (Completed)

Cable Laying Works Outside the Substation with CIVIL Works at Abu Dhabi Khalifa Port Container Terminal Phase 2 project site Terminal Phase 2 project site

SIEMENS AG – GP1-2685 Borwin 3 Offshore Project (Completed)

Electrical and Mechanical Installation Works Offer for Borwin 3 Converter Platform at Yard at Dubai Dry Dock Area. Electrical and Mechanical Installation

Sumisho Machinery Trade Corporation / TRANSCO Contract No. HWME-16-7010 – N-4554 (Completed)

500MVA Power Transformer Maintenance Works 400kV Saadiyat 400kV substation – IBT 3

CHINA HARBOUR ENGINEERING CO. L.L.C Substation Works (Completed)

Terminal Phase 2 project site Erection of 8 Substations 11/0.415kV at Abu Dhabi Khalifa Port Container Terminal Phase 2 project site

Abu Dhabi Motor Sports Management LLC – Contract No – 20151370

Abu Dhabi Motor Sports Management LLC

DEWA/SIEMENS Order No. 4507197435 (Completed)

Engineering, Procurement and Construction of DEWA No. 06 of 132/11kV Substation: Mobility,Jumeirah Hills & SAADAST

TRANSCO Contract No. HWME-16-7010 – N-4554 (Completed)

500MVA Power Transformer Maintenance Works 400kV Saadiyat 400kV substation – IBT 3

Department of the President Affairs 11/2385 (Completed)

Supply, Installation, Testing and Cable Laying Works for Azzam Yacht at Khalifa Port

Sumisho Machinery Trade Corporation / TRANSCO Contract No. HWMI-14-7004 (Completed)

Transformer Maintenance Works for 400kV Substation

TRANSCO Contract No. N-4554 (COMPLETED)

Project Description: Erection / Installation Works of 400/132/22kV Substation at Sadiyaat Island. April 10, 2010 - Saadiyat Photos

SIEMENS Contract No. CNE/599D

Supply, Installation, Testing and Commissioning of 400/132kV Car Complex and the residence (Dubai Land -2) Substations and associated works. January 2012 - Installation of 400kV bushingsOctober 2010 - Remcon Site Office - Dubai LandMay 23, 2010 - 132kV building /400kV building /400kV GIS room /indoor crane installed at 132kV room

SIEMENS – Contract No. E03/2009 (COMPLETED)

Northern Emirates - Fujairah Design & Build Cont. for 132/33/11kV Substation Project Manager/ Engineer Mr. Ganesan Pitchairaja January 30, 2011 - IDT Room( Inter Connection Distribution Transformer) / 132 KV GIS Room

AADC Contract No. A-4143 (COMPLETED)

Project Description: Supply, Installation & Comissioning of 11kV OHL Earth Fault Indicators Implementation of Line Fault Passage Indicator goes along with the aim of continually improvement of AADC system and AADC management commitment to provide the best services to our valued consumers. The use of these indicators will affect directly and positively on our OHL [...]

ADDC – Contract No. D-101611 (COMPLETED)

Replacement of 33/11kV 20MVA Power Transformer HTR1 at E12 (Free Port) Primary Substation Project Engineer : Eng. Jun Cris Lubang Site In-Charge – Eng. Ali mohamed Ali Abelaal Competent Person : Eng. Mohamed Khalil The purpose of this work/service order is to carry out Replacement of 33/11kV 20MVA Power transformer HTRI at E12 (Free Port) [...]

SUDKABEL – Project- N-6526 – Yas Island

132 kV Cable Double Circuit Connection Between The New 400/132kV G/S at BAHIA and The 132/22kV S/S at YAS ISLAND The scope of work of this project comprises the route survey, identification of existing services / cables along the cable route, design, manufacture, transport, erection, installation, jointing, termination, testing, commissioning and handing over in satisfactory [...]

TRANSCO Contract No. N-4915 – Reem Island – (COMPLETED)

Description: Installation works for 132kV Cables and Accessories at Reem Island Project Details The scope of works fully detailed in our tender documents and subsequent clarification (inclusive of withdrawal of all commercial/technical deviations with TRANSCO terms and conditions). Your technical offer dated 26.11.2006 shall include but not limited to: New 3x132kV Substation at Reem Island [...]

AL KHARAFI & SONS/SUDKABEL Contract No. 2(COMPLETED)

RANSCO Services Eastern Corniche at IP-111 and IP-IIIA Project Description: Upgrading of Al Salam Street and Eastern Corniche Road to an Expressway Project Details: Due to the upgrading of Al Salam Street and of the Eastern Corniche to an Expressway, the Abu Dhabi Municipality requires the relocation of part of several existing 132 kV cable [...]

SUDKABEL Contract No. N-6377(COMPLETED)

Project Description 132kV XLPE Cable Works at Ras Al Khaimah Project Details This Tender Document call for the design, engineering, procurement, erection, commissioning and handing over of 132kV Cable routes as specified below: Lot 1: Route A: From TRANSCO 400/132kV S/S to Qusaidat 132/33 kV S/S September 17, 2009 - -Fixing of Earth Ring / [...]

TRANSCO Contract No. N-6126 (COMPLETED)

Replacement of existing 132kV Oil filled cables by 1000 sq.mm XLPE Cables January 2010 - Red Sand above the covering tiles SPAN 3 Circuit C - Salam Street/Fixing of covering tiles for Span 3, Circuit C - Salam St.june 10, 2010 - High Voltage Test for Circuit C

TRANSCO Contract No. N-5812.1 (COMPLETED)

Power Supply to Al Mafraq Workers City F1 & F2 Lot 1 220/33Kv Temporary Substation Abu Dhabi Transmission & Despatch Company Company Project Title: Power Supply to Al Mafraq Workers City F1 & F2 Lot 1 – 220/33Kv Temporary Substation Abu Dhabi Transmission & Despatch Company Project Details Under the scope of contract, the contractor [...]

TRANSCO Contract N-6325 (COMPLETED)

Project Description: Protection Relays on 132kV Cable Feeders with current differential protection Relays and related telecommunication and protection signaling equipment ((Lot 1:4 CIRCUITS)(Lot 2:3 CIRCUITS) E4 Substation Project Description: Protection Relays on 132kV Cable Feeders with current differential protection Relays and related telecommunication and protection signaling equipment ((Lot 1:4 CIRCUITS)(Lot 2:3 CIRCUITS) Last May 12 & [...]

CONTRACT NO. N-6878 (COMPLETED)

Supply and Installation of new 220/33 kV Mobile at Shamkha Area and Replacement of old Battery & Battery Chargers in Substations 220kV UAN Project Manager : Mr. Anil Tandon February 11, 2010 - Group photos of Shamka Team headed by Project Manager Anil Kumar Tandon with Mr. Gerhard Siegel (Remcon Managing Partner). Mr. Sayed Imtiaz [...]

TRANSCO Contract No. N-7641

132/33 kV Mobile substation at Sudah Port to Feed IPIC Loads. Location: Fujairah. Project Managers:      Mr. Anil Kumar Tandon                                        Mr. Mohammed Gaweish October 25, 2010 - Substation Backfilling - Leveling works / 415 LV [...]

TRANSCO(2010) Contract No. N-7747 (COMPLETED)

Supply and Installation of New 220/33 kV Mobile At Qaser Al Sarab in Hameem Liwa East Project Managers:      Mr. Anil Kumar Tandon                                        Mr. Mohammed Gaweish October 25, 2010- 220KV Transformer EnergizationOctober 12, 2010 - [...]

TRANSCO(2011) Contract No. N-11777(COMPLETED)

Shifting of 140MVA Power Transformer from Ghantoot to Al Wathba 220-33kV Substation Project Manager - Engr. Jun Cris Lubang Civil Engineer - Yasser Semary Civil Engineer - Peter Andrews Site Engineer - Ali Abdelaal Safety Officer - Henry Cunanan April 01, 2012May 1-6, 2012 - Protection Works / 140MVA Transformer Marshalling Kiosk / SF6 Filling [...]

ADPC Contract No. DOPC / 0091/2012

Operation and Maintenance of 33kV  and 11kV Substation and Cabling  Network O & M Managers : Mr. Ahmed Khalil/ Mr. Wassim Tawfik Safety Officer - Mr. Renante Javellana May 12, 2013 - Toolbox instructions prior to shutdownFamiliarization to equipments and panelsTransformer MaintenanceMr. Javellana demonstrate how to use the Eye FlushSafe entry to 11kV & 33kV [...]

TRANSCO Contract No. N- 12260

TRANSCO Contract No. N-12260 Relocation of one 220/33kV Transformer from AAIC to AAPS Installation, Testing & Commissioning of 220/33kV Substation Project Manager - Engr. Mohamed Gaweish Safety Officer - Mr. Henry Cunanan November 10, 2013 - EnergizationMarch 11, 2012 - Bore Hole Drilling

C1660 25xARMG Cranes & C1655 10xSTS Cranes (Completed)

Gulf Piping Co. W.L.L Supply and Installation of 22kV & 11kV Cable Accessories Photos by: JB Peralta

ADPC Contract No. 2101-201

Permanent Power to the Abu Dhabi Terminals (ADT) Tents at Khalifa Port PROGRESS PHOTOS - August 2014

TRANSCO Contract No. N- 11022

TRANSCO Contract No. N- 11022 TRANSCO N/A UAE Transferring and Installation of 132/11kV Mobile Station from YAS Island to Mussafah Area (M12) and associated works Project Manager - Engr. Mohamed Gaweish Safety Officer - Mr. Reynante Javellana December 17, 2012 - CT ratio & Polarity check Installation of new Protection Panel November 29, 2012 - [...]