Permanent Power to the Abu Dhabi Terminals (ADT) Tents at Khalifa Port Abu Dhabi Terminals (ADT)
Transportation & Erection of Electrical Equipments related to the New Route 2020 Metro Project Substations for 9 EXTENTION MS Metro Project Substations for 9 EXTENTION MS
Transportation & Erection of Electrical Equipment’s related to the New Route 2020 Metro ENHANCEMENT Works for 7 Nos of Existing Metro Stations Transportation & Erection of Electrical Equipment’s
Transportation & Erection of Electrical Equipment’s related to the New Route 2020 Metro ENHANCEMENT Works for 3 DEPOTS New Route 2020 Metro
GT09 – Main Transformer Re-winding, Re-Insulating & Commissioning GT09 – Main Transformer
Cable Laying Works Outside the Substation with CIVIL Works at Abu Dhabi Khalifa Port Container Terminal Phase 2 project site Terminal Phase 2 project site
Electrical and Mechanical Installation Works Offer for Borwin 3 Converter Platform at Yard at Dubai Dry Dock Area. Electrical and Mechanical Installation
500MVA Power Transformer Maintenance Works 400kV Saadiyat 400kV substation – IBT 3
Terminal Phase 2 project site Erection of 8 Substations 11/0.415kV at Abu Dhabi Khalifa Port Container Terminal Phase 2 project site
Abu Dhabi Motor Sports Management LLC
Engineering, Procurement and Construction of DEWA No. 06 of 132/11kV Substation: Mobility,Jumeirah Hills & SAADAST
500MVA Power Transformer Maintenance Works 400kV Saadiyat 400kV substation – IBT 3
Supply, Installation, Testing and Cable Laying Works for Azzam Yacht at Khalifa Port
Transformer Maintenance Works for 400kV Substation
Project Description: Erection / Installation Works of 400/132/22kV Substation at Sadiyaat Island. April 10, 2010 - Saadiyat Photos
Supply, Installation, Testing and Commissioning of 400/132kV Car Complex and the residence (Dubai Land -2) Substations and associated works. January 2012 - Installation of 400kV bushingsOctober 2010 - Remcon Site Office - Dubai LandMay 23, 2010 - 132kV building /400kV building /400kV GIS room /indoor crane installed at 132kV room
Northern Emirates - Fujairah Design & Build Cont. for 132/33/11kV Substation Project Manager/ Engineer Mr. Ganesan Pitchairaja January 30, 2011 - IDT Room( Inter Connection Distribution Transformer) / 132 KV GIS Room
Project Description: Supply, Installation & Comissioning of 11kV OHL Earth Fault Indicators Implementation of Line Fault Passage Indicator goes along with the aim of continually improvement of AADC system and AADC management commitment to provide the best services to our valued consumers. The use of these indicators will affect directly and positively on our OHL [...]
Replacement of 33/11kV 20MVA Power Transformer HTR1 at E12 (Free Port) Primary Substation Project Engineer : Eng. Jun Cris Lubang Site In-Charge – Eng. Ali mohamed Ali Abelaal Competent Person : Eng. Mohamed Khalil The purpose of this work/service order is to carry out Replacement of 33/11kV 20MVA Power transformer HTRI at E12 (Free Port) [...]
132 kV Cable Double Circuit Connection Between The New 400/132kV G/S at BAHIA and The 132/22kV S/S at YAS ISLAND The scope of work of this project comprises the route survey, identification of existing services / cables along the cable route, design, manufacture, transport, erection, installation, jointing, termination, testing, commissioning and handing over in satisfactory [...]
Description: Installation works for 132kV Cables and Accessories at Reem Island Project Details The scope of works fully detailed in our tender documents and subsequent clarification (inclusive of withdrawal of all commercial/technical deviations with TRANSCO terms and conditions). Your technical offer dated 26.11.2006 shall include but not limited to: New 3x132kV Substation at Reem Island [...]
RANSCO Services Eastern Corniche at IP-111 and IP-IIIA Project Description: Upgrading of Al Salam Street and Eastern Corniche Road to an Expressway Project Details: Due to the upgrading of Al Salam Street and of the Eastern Corniche to an Expressway, the Abu Dhabi Municipality requires the relocation of part of several existing 132 kV cable [...]
Project Description 132kV XLPE Cable Works at Ras Al Khaimah Project Details This Tender Document call for the design, engineering, procurement, erection, commissioning and handing over of 132kV Cable routes as specified below: Lot 1: Route A: From TRANSCO 400/132kV S/S to Qusaidat 132/33 kV S/S September 17, 2009 - -Fixing of Earth Ring / [...]
Replacement of existing 132kV Oil filled cables by 1000 sq.mm XLPE Cables January 2010 - Red Sand above the covering tiles SPAN 3 Circuit C - Salam Street/Fixing of covering tiles for Span 3, Circuit C - Salam St.june 10, 2010 - High Voltage Test for Circuit C
Power Supply to Al Mafraq Workers City F1 & F2 Lot 1 220/33Kv Temporary Substation Abu Dhabi Transmission & Despatch Company Company Project Title: Power Supply to Al Mafraq Workers City F1 & F2 Lot 1 – 220/33Kv Temporary Substation Abu Dhabi Transmission & Despatch Company Project Details Under the scope of contract, the contractor [...]
Project Description: Protection Relays on 132kV Cable Feeders with current differential protection Relays and related telecommunication and protection signaling equipment ((Lot 1:4 CIRCUITS)(Lot 2:3 CIRCUITS) E4 Substation Project Description: Protection Relays on 132kV Cable Feeders with current differential protection Relays and related telecommunication and protection signaling equipment ((Lot 1:4 CIRCUITS)(Lot 2:3 CIRCUITS) Last May 12 & [...]
Supply and Installation of new 220/33 kV Mobile at Shamkha Area and Replacement of old Battery & Battery Chargers in Substations 220kV UAN Project Manager : Mr. Anil Tandon February 11, 2010 - Group photos of Shamka Team headed by Project Manager Anil Kumar Tandon with Mr. Gerhard Siegel (Remcon Managing Partner). Mr. Sayed Imtiaz [...]
132/33 kV Mobile substation at Sudah Port to Feed IPIC Loads. Location: Fujairah. Project Managers: Mr. Anil Kumar Tandon Mr. Mohammed Gaweish October 25, 2010 - Substation Backfilling - Leveling works / 415 LV [...]
Supply and Installation of New 220/33 kV Mobile At Qaser Al Sarab in Hameem Liwa East Project Managers: Mr. Anil Kumar Tandon Mr. Mohammed Gaweish October 25, 2010- 220KV Transformer EnergizationOctober 12, 2010 - [...]
Shifting of 140MVA Power Transformer from Ghantoot to Al Wathba 220-33kV Substation Project Manager - Engr. Jun Cris Lubang Civil Engineer - Yasser Semary Civil Engineer - Peter Andrews Site Engineer - Ali Abdelaal Safety Officer - Henry Cunanan April 01, 2012May 1-6, 2012 - Protection Works / 140MVA Transformer Marshalling Kiosk / SF6 Filling [...]
Operation and Maintenance of 33kV and 11kV Substation and Cabling Network O & M Managers : Mr. Ahmed Khalil/ Mr. Wassim Tawfik Safety Officer - Mr. Renante Javellana May 12, 2013 - Toolbox instructions prior to shutdownFamiliarization to equipments and panelsTransformer MaintenanceMr. Javellana demonstrate how to use the Eye FlushSafe entry to 11kV & 33kV [...]
TRANSCO Contract No. N-12260 Relocation of one 220/33kV Transformer from AAIC to AAPS Installation, Testing & Commissioning of 220/33kV Substation Project Manager - Engr. Mohamed Gaweish Safety Officer - Mr. Henry Cunanan November 10, 2013 - EnergizationMarch 11, 2012 - Bore Hole Drilling
Gulf Piping Co. W.L.L Supply and Installation of 22kV & 11kV Cable Accessories Photos by: JB Peralta
Permanent Power to the Abu Dhabi Terminals (ADT) Tents at Khalifa Port PROGRESS PHOTOS - August 2014
TRANSCO Contract No. N- 11022 TRANSCO N/A UAE Transferring and Installation of 132/11kV Mobile Station from YAS Island to Mussafah Area (M12) and associated works Project Manager - Engr. Mohamed Gaweish Safety Officer - Mr. Reynante Javellana December 17, 2012 - CT ratio & Polarity check Installation of new Protection Panel November 29, 2012 - [...]